🔧 Project Summary

  1. Replacement of Distribution Boards in the Kitchen
    The existing electrical distribution boards in the kitchen are being replaced to enhance safety and ensure compliance with modern electrical standards.
  2. New Lighting and Power to the Kitchen
    Upgraded lighting and power systems are being installed in the kitchen to support efficient operations and improve the working environment for staff.
  3. AMP Works – External Site Enhancements
    As part of our ongoing Asset Management Plan (AMP), the following site-wide improvements are being carried out:
  • Removal of overgrown ivy from buildings and boundaries to prevent structural damage and improve site appearance
  • Tree remedial works to maintain health and safety around the school grounds
  • Damp proofing work on the exterior of buildings to protect against water ingress and maintain structural integrity